Skip to content
CHERT Chain

Supply-chain planning · born integrated with ChertERP · Saudi Arabia

When spreadsheets stop scaling. Forecasts, stock and supply plans — from ChertERP, back as drafts you approve.

ChertChain forecasts demand, sets safety stock and builds a constrained supply plan from the items, stock, orders and sales history already in ChertERP. It proposes; your team approves in the system it already uses. Nothing reaches a purchase order that a person did not approve.

Planning stages
9
Forecast methods
5
Languages
2
Unapproved ERP writes
0

Capabilities

What it plans

One engine plans demand, stock, purchasing and production against the same constraints, so a forecast change shows up in a purchase proposal the same night.

Demand forecasting

Statistical forecasts from your real sales history — constant, trend, seasonal, intermittent and moving average — with the best-fitting method picked per item automatically.

Planner overrides

Refine any number at any level — item, category, warehouse, customer — in a spreadsheet-like editor. Changes roll up and down by themselves.

Inventory optimization

Safety stock and reorder points per item and location, sized against demand variability and supplier lead time — so working capital sits where it earns.

Purchase planning

Net requirements turned into purchase proposals per supplier, respecting lead times, minimum quantities and lot sizes.

Production scheduling

Constrained plans that respect capacity, material availability and routings — not an infinite-capacity wish list.

Distribution

Stock moved between warehouses before it runs out where it is needed and piles up where it is not.

Problems first

Late orders, shortages and overloaded resources surfaced as a list to work through, each one traceable to its cause.

English and Arabic

A complete Arabic interface with right-to-left layout and proper supply-chain vocabulary, from the same codebase as the English one.

Planning cycle

Nine stages, from ChertERP and back again

Planning is a cycle, not a report. It runs every night on fresh data, and nothing leaves it without a person's approval.

Stage 01 / 09

Import

Read what ChertERP already knows

Items, bills of materials, stock per warehouse, open orders and sales history are read straight from ChertERP over a read-only database role. No exports, no files, no double entry.

Run by

Stage 02 / 09

Forecast

Let the history speak first

Every item gets a statistical forecast; the engine tries each method and keeps the one with the lowest error on that item's own history.

Run by

Stage 03 / 09

Refine

Add what the history cannot know

A promotion, a lost customer, a new branch. Planners override at whatever level they think in, and the change is distributed to the items underneath.

Run by

Stage 04 / 09

Buffer

Decide how much uncertainty to carry

Safety stock and reorder points are sized from forecast error and supplier lead time, per item and per location.

Run by

Stage 05 / 09

Plan

Against real constraints

The solver plans purchasing, production and transfers together, respecting capacity, material and lead time. What cannot be on time is planned late and said so.

Run by

Stage 06 / 09

Explain

Every number has a reason

Why is this order late? Which demand is this purchase for? Pegging traces every supply to the demand it serves, and what-if scenarios test a change before you make it.

Run by

Stage 07 / 09

Approve

A person decides

Planners review the proposals in the cockpit. Only what they accept moves on; the rest stays a proposal.

Run by

Stage 08 / 09

Export

Drafts, never postings

Accepted proposals are sent through ChertERP's own REST API as draft requisitions, each with an idempotency key so a retry can never create a duplicate.

Run by

Stage 09 / 09

Reconcile

Both sides, every night

What was exported is compared with what ChertERP created. A mismatch is logged for a person to look at — never quietly corrected.

Run by

Interactive architecture

Every layer of a plan — and the component that runs it

Select any component to see what it does, or play a journey and watch the work move through the system.

Select a component, or play a journey.
01

In ChertERP

Where the truth about execution lives, and stays.

02

Connector

One way in, read-only, on a private network.

03

Planning engine

A compiled solver that plans everything against everything.

04

Workbench

Where planners think, in their language.

05

Back to ChertERP

Proposals go back the front way, as drafts.

06

Evidence

What lets you trust the plan tomorrow.

ChertChain never inserts into or updates a ChertERP table. It reads over a read-only role and writes only through ChertERP's REST API, only drafts, and only what a planner accepted. ChertERP owns execution truth; ChertChain owns planning truth.

Guarantees

The rules the integration cannot break

Not policies written in a document. Constraints in the permissions and the code.

Read-only by permission

The import role can select and nothing else. Not a setting someone can forget — a permission it was never granted.

Drafts only

Everything sent to ChertERP is a proposed or draft document. People approve; ChertChain never posts.

Through the front door

Writes go through ChertERP's REST API with its validation and its business rules, never around them into its tables.

Safe to retry

Every exported document carries an idempotency key, so a retry after a timeout never makes a duplicate requisition.

Reconciled, not corrected

Exported and created documents are compared nightly. Mismatches are logged for a person and never fixed automatically.

Private by network

The ERP database is reached over a private network only. Its port is never open to the internet.

Every number explains itself

Pegging links each proposal to the demand behind it, so the plan can always say why.

English and Arabic, one codebase

Not a translation layer over an English product. Right-to-left is a first-class direction in every screen.

Components

What is actually running

Five parts on one server, next to ChertERP on the same private network.

Planning engine

C++ · the solver and the forecasts

  • Forecasting, inventory planning and constrained supply planning in one model
  • Plans purchasing, production and distribution together
  • Pegging from every supply to the demand it serves

Workbench

Web · English and Arabic

  • Forecast editor, plan editor and planning cockpit
  • Inventory, capacity and problem reports
  • What-if scenarios side by side with the live plan
  • Can be embedded inside ChertERP's own screens

ERP connector

Python · read-only import

  • Items, BOMs, stock, orders, suppliers and sales history
  • A dedicated database role with select permission only
  • Over the private network between the two servers

Exporter

REST · drafts with idempotency keys

  • Accepted proposals become draft requisitions in ChertERP
  • A key per document, so retries are always safe
  • Nightly reconciliation against what ChertERP created

Operations

Linux · TLS · nightly backups

  • HTTPS everywhere with automatically renewed certificates
  • Key-only SSH, firewall and automatic security updates
  • Nightly database backups

Who owns what

Two systems, one truth each

ChertERP runs the business; ChertChain plans it. Neither changes the other's data on its own.

Two systems, one truth each
ChertERPChertChain
Its truthExecution — what happenedPlanning — what should happen
Items, stock, orders, historyOwns and maintainsReads, read-only
Forecasts and safety stockNot involvedOwns
Purchase and production ordersReceives drafts; people approveProposes; never posts
When the two disagreeLogged nightly, fixed by a personLogged nightly, fixed by a person

ChertChain can also be opened inside ChertERP's own screens, so planners do not have to leave the system they already work in.

Plan next month on last month’s real data.

Connect ChertChain to ChertERP, run a forecast, and review every proposal before anything reaches a purchase order.